![]() Figure 2-9.-QA Form 10, Re-Entry Control Log. 
QA FORM 16, MATERIAL DEFICIENCY 
this condition will have little or no effect on the 
REPORT 
equipment operation. If the release is authorized, the 
reject tag and the Material Deficiency Report (QA Form 
This form (fig. 2-11) is used to provide a uniform 
16) must be filed in the QA office files, along with the 
method of reporting and recommending disposition of 
completely filled out QA form 15. Then, the released 
rejected material to the supply department. It is used 
material may be used, but one of the following three 
where required to supplement QA Form 3 and instead 
actions must be completed before the certification tiles 
of QA Form 15. The report contains a descriptive 
statement of material for a job order within the scope of 
are completed. 
this program and includes necessary sketches, 
Material released for use and action complete 
photographs, samples, and blueprints. This report 
recommends a course of action. 
Material released for use but must be re-worked 
at a later date 
QA FORM 17, TEST AND INSPECTION 
FORM-OTHER THAN NDT 
Material released for use but must be replaced at 
a later date 
This form (fig. 2-12) lists all the tests and 
The use of QA Form 15 (fig. 2-10) requires the 
inspections that must be performed at each step. A QA 
initiation of QA Form 12, Departure from Specifications 
Form 17 must be completed and signed off before any 
step can be signed off on the QA Form 10. 
Request. 
2-22 
 | 
| 
 