Figure 2-6.-QA Form 7, Controlled Material Inventory/Record.
QA FORM 13, QUALITY ASSURANCE
QA FORM 9, RE-ENTRY CONTROL FORM
INFORMATION SHEET
This form (fig. 2-8) is used to document re-entry
This form provides the IMA with the necessary
into a SUBSAFE boundary and is used in a controlled
information to develop a CWP before the start of work.
work procedure.
When filled out, this sheet will be attached to the
4790/2K and delivered to the IMA. For CSMP entries,
QA FORM 9A, RE-ENTRY CONTROL
this form is delivered to the IMA at the pre-arrival
SUPPLEMENT SHEET
conference.
This sheet supplements QA Form 9 and is used to
QA FORM 15, REQUEST FOR RELEASE OF
record additional information.
REJECTED MATERIAL OR
WORKMANSHIP
QA FORM 10, RE-ENTRY CONTROL LOG
Should there be an urgent and overriding
requirement for the use of material or workmanship, the
The re-entry control log (fig. 2-9) is used to provide
a chronological record of re-entry into SUBSAFE
division officer/production officer may request that the
repair officer and squadron material officer release
boundaries. Each time a QA Form 9 is used, the IMA,
rejected material or workmanship. For example, a shaft
QAO, or ship's engineer must log the time issued and
has been machined undersize, but it is determined that
serial number assigned on QA Form 10.
2-17